Listado completo de obras
 
Yerevan City Airport
Republic of Armenia

Air conditioning, heating and mechanical ventilation installations. Capacity 1200 tons. 30.000m2 Building.

a. Design of Building management system BMS. b. Access control system.
c. CCTV system.

Entire Project Design, detail engineering and counseling to the Project manager (Aeropuertos Argentina 2000).
Tte. Gral. J. D. Perón 1730 P. 2 Of. 31
(C1037ACH) | Buenos Aires | Argentine
Tel. (54-11) 4374-8385 | 4373-3486
E-mail: estudio@estudio-grinberg.com.ar